Interior Design Quotation in Singapore: How to Read an HDB or Condo Reno Quote Line by Line

Two renovation quotes for the same four-room flat can differ by $20,000, and both can be honest. 

One might price carpentry to the ceiling while the other stops at 2.1 metres. One might include haulage and the HDB permit. The other might leave them as "to be advised". The total is the least useful number on the page.

This guide will tell you how to read an interior design quotation before you sign one, section by section, with the units, terms and gaps that change what you're actually buying.

Living Room Interior Design

377B Hougang Street 22 - HDB BTO 5 Room

What Does an Interior Design Quotation Actually Cover?

A quotation for interior design work in Singapore usually bundles two things 

  • The Design Side 

  • The Build Side

And it’s important to understand the distinction.

The design side covers space planning, 3D drawings, material selection and project coordination. 

Then there's the build side, the trades that physically change your home. 

Some firms charge a separate design fee. Others fold it into the build prices and call the design "free".

Neither approach is wrong. But it affects how you compare quotes, because a firm that shows its design fee as its own line is showing you something the other firm has hidden inside its carpentry rate.

It also helps to know what kind of document you've got. 

A package quote (something like "4-room BTO package, S$38,000") is a bundle priced in advance, usually with fixed quantities and a list of what's included. 

An itemised quote prices each piece of work for your specific flat. Packages are easier to compare at a glance and harder to compare in detail. If you've been given a package, ask for the quantities behind it.

A Sample Of Interior Design Quotation Layout

Most Singapore quotes follow roughly the same order, grouped by trade. The figures below are deliberately left out. What matters here is the structure, and the questions each section should answer.

  • Preliminaries: site protection, HDB or MCST permit application, debris haulage, final cleaning. Usually priced as a lot. Ask: is the permit fee included, or only the application?

  • Hacking and demolition: wall hacking, floor tile removal, kitchen and toilet strip-out. Priced by lot, by sq ft or per item. Ask: has the firm checked which walls are structural?

  • Masonry and tiling: new walls, floor screed, wall and floor tiles, vinyl or laminate flooring. Priced per sq ft. Ask: is the tile supply included, and up to what price per sq ft?

  • Carpentry: kitchen cabinets, wardrobes, shoe cabinet, TV console, platform, feature walls. Priced per foot run or sq ft. Ask: what height, what laminate, and which hinges and drawer runners?

  • Ceiling and partition: false ceiling, L-box, cove lighting box, partition walls. Priced per sq ft or foot run. Ask: is the ceiling flat, or does the price include boxing for pipes?

  • Electrical: lighting points, power points, data points, DB box changes. Priced per point. Ask: does a "point" include the wiring run, or just the socket?

  • Plumbing: sink, basin and tap installation, water heater, piping. Priced per item. Ask: are the fittings supplied, or only installed?

  • Painting: walls, ceilings, doors, grilles. Priced by lot or sq ft. Ask: how many coats, which paint brand, and are doors included?

  • Glass and aluminium: shower screen, mirror, window grilles. Priced per item or sq ft. Ask: how thick is the glass, and what type of frame?

  • Doors: bedroom doors, main door, toilet bifold doors. Priced per unit. Ask: is the main door replacement fire-rated where required? 

Treat this as an interior design quotation template for your own checking. Put each firm's figures in the same rows, and the gaps show up straight away.

How to Read The Units: Foot Run, Sq Ft, Point And Lot

Units are where most people get lost, and where most quote disagreements start.

A foot run measures length along the wall, roughly 30.5 cm per foot, regardless of height. It's the standard unit for carpentry. The trap is that two firms quoting "per foot run" for a wardrobe can mean very different cabinets. One can be talking about full-height with internal drawers. The other assumes a standard height with a hanging rail and one shelf.

Here's how much that matters. Take the example of an 8-foot wardrobe. Suppose Firm A quotes S$300 per foot run and Firm B quotes S$240 (example rates, not market prices). On the face of it, B is S$480 cheaper. Now, let’s read the small print.

If A's rate covers full height to the ceiling with two drawers and soft-close hinges, and B's covers a 2.1m cabinet with a separate charge of S$60 per foot run for the top-up section, B's real figure is the same as A's, before you've added the drawers. 

This is the most common reason two “per foot run” quotes for the same wardrobe end up costing the same

Square feet is used for area work: flooring, tiling, false ceilings and sometimes feature walls. Check whether the figure is measured from the floor plan or after a site measurement, because wastage on cut tiles is real and someone pays for it.

"Per point" is the electrical unit. A lighting point, a 13A power point and a data point are each priced separately. Ask whether the price includes the wiring back to the DB box and any trunking, since a point quoted cheaply may assume the shortest possible run.

"Lot" means a lump sum for a defined scope. It's normal for haulage, cleaning and permit admin. It's a warning sign on big-ticket work like hacking an entire kitchen, because a lot price is only as clear as the description written next to it.

Bedroom interior design


997B Buangkok Crest - HDB BTO 4 Room

How HDB and Condo Quotations Differ

Your property type changes what should appear on the page.

For an HDB flat, works such as hacking non-structural walls, replacing floor finishes and replacing a main door along a fire escape route need an HDB renovation permit, and the contractor applying for it has to be on HDB's Directory of Renovation Contractors. The quote should say who submits the permit. 

Your timeline should allow for HDB's rules: once the permit is approved, HDB expects renovation to be completed within three months for new flats and one month for existing flats. Noisy work like hacking and tile removal is only allowed on weekdays from 9 am to 5 pm, and not on the eve of major public holidays.

New BTO owners should look for one item that shouldn't be there. HDB doesn't allow wall or floor finishes in the toilets of a new flat to be removed for three years, to protect the waterproofing. If a BTO quote includes hacking toilet tiles in year one, ask why. Laying new finishes over the existing ones is the usual alternative.

A main door is another line to check. If yours faces a staircase or lift lobby, a replacement door and frame must be half-hour fire-rated with a door closer, and you'll need a permit. A cheaper non-rated door on that line is a problem, not a saving.

Condo quotes follow the management corporation's by-laws instead. Expect lines for the MCST renovation deposit, approved working hours, lift protection and sometimes a booking fee for the service lift. These vary by development, so a good quote will reference your condo's own rules rather than a generic template.

Interior Design Quotation Terms And Conditions: Worth Reading Twice

The terms page decides what happens when something goes wrong, which is why it matters more than any single line item.

Start with the payment schedule. CaseTrust-accredited renovation businesses must cap the initial deposit at 20% of the total, collect the rest in stages tied to agreed milestones, and protect deposits with a deposit performance bond. 

Even if your firm isn't accredited, that's a fair benchmark. A request for 50% upfront deserves a direct question.

Next, variation orders. Changes always happen during a renovation. The terms should say that any change to scope or price is agreed in writing, with the revised amount, before the work is done. Without that clause, you'll be negotiating extras at the end, when you have the least leverage.

Exclusions come next, and they're usually listed in a short paragraph that's easy to skim past. Common ones are appliances, light fittings, curtains, loose furniture, aircon, and anything described as "provisional".

 Ask the firm to put a budget figure next to each provisional item so the quote total is closer to what you'll really spend.

Then read the warranty: how long, what it covers (workmanship, materials or both), and how defects are reported. 

Finally, check the timeline and what happens if it slips, on either side.

Free Quotation Interior Design Offers: What "Free" Really Means

Almost every firm in Singapore offers a free first quotation. That's fine. A first quote is a sales document, built from your floor plan and a conversation. What you should expect it to be is accurate in structure and honest about what it's assumed.

Where we'd disagree with a lot of renovation advice is on design fees. The common line is that a firm charging for design is less competitive than one that doesn't. We'd argue the reverse. 

When design has its own line, you can see what you're paying for drawings, revisions and coordination, and you can ask whether two rounds of revisions are included or five. When design is "free", that work is still paid for, just inside your cabinet rates, where you can't see it or negotiate it.

Red flags worth acting on: a single-line quote with no quantities, prices that drop sharply the moment you hesitate, pressure to sign the same day, "lot" pricing on major works, and missing terms for variations or warranty.

Well-lit living room interior design

Blk 433A Northshore Dr - HDB BTO 4 Room

Comparing Two Quotes Like For Like

When you're holding three quotes, the fastest way to compare them is to rebuild them into one table. Use the layout above, copy it into Excel or into Word if you prefer an interior design quotation format in Word, and give each firm a column. 

Fill in quantities first, then rates. Where a firm has no figure for a row, find out whether the item is excluded, included elsewhere, or simply forgotten.

That exercise usually reveals the real gap between firms within an hour. It's often smaller than the headline totals suggested, and occasionally much bigger.

If you've been searching for an interior design quotation template download, you don't need anything elaborate. A spreadsheet with section, item, unit, quantity, rate, amount and remarks columns covers almost every Singapore renovation.

What A Quotation Cover Letter Usually Says

Most firms send a short covering note with the quote. If you've asked for an interior design quotation letter sample, it typically reads something like this:

"Dear Ms Tan, thank you for the opportunity to quote for the renovation of your 4-room HDB flat at Block 123. Attached is our itemised quotation, reference Q-0123, based on the floor plan and site visit on 2 November. Prices are valid for 30 days and exclude GST where stated. The quotation is subject to the terms and conditions on the final page, including the payment schedule and variation procedure. We'd be happy to walk you through it."

What matters in the letter is the reference number, the date of the site visit, how long the prices are valid, and the line pointing to the terms. Keep it with the quote. If the scope changes later, both documents should be revised together.

Get An Itemised Quotation From AC Vision

AC Vision works on HDB, condo and commercial renovations, from carpentry and electrical works to painting and full-home projects. If you'd like a quotation for your home that's laid out section by section, with quantities and units you can check against the guide above, get in touch with our team.

Frequently Asked Questions

What should an interior design quotation include for a Singapore HDB renovation?

A clear quotation breaks everything down by room or trade so you can see exactly what you are paying for. It should list quantities and measurements (for example, carpentry lengths or flooring area), name the materials and finishes (board type, laminate grade, hardware brand), and show labour separately where possible. It also needs to state what is excluded, whether GST is included, the estimated timeline, payment milestones, and any warranty period. 

How do I compare interior design quotations for a condo renovation?

The simplest and fairest way is to make sure every firm is pricing the same scope before you look at the total. Ask them to itemise the same rooms and trades, use similar material specifications, and list exclusions clearly. Then compare line by line—carpentry, flooring, electrical points, wet works, and so on—instead of just the bottom figure. For condos, also check whether MCST deposits, lift protection, and working-hour restrictions are covered or left as extras. Once the scopes match, you can judge which quote offers better value or clearer terms instead of simply choosing the lowest number.

How much does an interior design quotation typically cost in Singapore?

There is no fixed fee for the quotation itself—most firms prepare one free or for a small consultation charge after a site visit or brief. The real cost is the full renovation package that the quotation prices. AC Vision offers free quotation for interior design and renovation in Singapore. 

What questions should I ask before accepting an interior design quotation?

Ask what materials and brands are specified for the main items, and whether you can see samples. Check what is deliberately excluded so you know what you will still need to buy or arrange. Find out how variation orders (extra work after the quote) will be priced and approved in writing. Clarify the warranty period for workmanship and waterproofing, who handles HDB or MCST permits, and the payment schedule tied to completed stages. Also ask about the expected timeline and what happens if the project runs late. 

What is the difference between an interior design quotation and a renovation contract?

A quotation is the firm’s priced offer that sets out the scope, materials, and costs. It is useful for comparison but is not always the full legal agreement. The renovation contract is the binding document that governs how the project actually runs—it usually incorporates the quotation and adds details such as the payment schedule, start and completion dates, how changes are approved, the defects liability period, and what happens if there is a dispute. 

What are common hidden charges in renovation quotations from design firms?

Common charges that appear later include haulage and debris disposal, floor and lift protection, and site cleaning. Electrical work is often quoted as a lump sum so additional points or fittings cost more. Kitchen or bathroom accessories such as sinks, taps, and sanitary ware are sometimes excluded even when installation is listed. Permits, MCST deposits, waterproofing membranes, and rectification of unexpected site conditions can also turn into variation orders. 

Should an interior design quotation include GST?

It should say clearly whether prices include GST. Only GST-registered firms can charge it, and the rate is currently 9%. If a quote is silent on GST, ask before you sign, since it changes the total noticeably on a five-figure project.

How long is a renovation quotation valid?

Most firms state a validity period, often around 30 days, because material and labour prices move. If you take longer to decide, ask the firm to confirm the prices in writing before you pay a deposit.