HDB BTO Renovation Package (Standard)

3-room BTO renovation package: $16,999

4-Room BTO renovation package $19,999

5-room BTO renovation package $21,399

 
bto standard reno
 

A. Professional Service

  1. Design concept consultation

  2. Space planning & Layout plan proposal

  3. Designer's 3D computerized drawing

  4. Material and colour scheme proposal

  5. Project management & site supervision

B. Masonry Works

  1. Supply & lay 600x 600mm homogeneous floor tiles with skirting at living room

  2. Supply & lay 600x 600mm homogeneous floor tiles with skirting at dining room

  3. Supply & lay pre-pack cement 2-1 screening for all bedroom

  4. To supply and lay 3mm vinyl floor at all bedroom floor area c/w skirting finish (free upgrade to 5mm)

  5. Supply & lay construct main entrance door kerb with tiles finish

  6. Construct 50 mm ht kitchen cabinet base with tiles skirting

C. Plumbing Works

  1. Supply & install 2"pvc outlet pipe for kitchen sink

  2. Supply labours to install kitchen sink

  3. Supply labours to install kitchen sink tap

  4. Supply labours to install instant heater x 2 or tank heater x 1

  5. Supply labours to install 2 x toilet accessories

D. Painting Works

  1. Supply labours & material to paint whole house internal wall using Vinlex 5000

  2. Supply labours & material to paint whole house internal ceiling using matex paint 4+1

  3. Supply labours & material to paint all room door & frame with pipe (if any )

E. Carpentry Works

  1. To supply and install upper and low storage cabinet with selected laminate finish c/w ABS Trimming and solid ply wood 20ft ( Internal colour pvc finish ).

    • 1 unit cutlery tray

    • glass panel door x 1

    • selected drawers c/w metal runner x 3 soft close

    • Selected soft close hinges

    • dish rack x 1

    • run cooker hood points

    • labour to install cooker + hood

  2. To supply and install selected 20mm quartz work top 10ft with 50mm backsplash

F. Miscellaneous

  1. Haulage service & Debris removal fee

  2. General Washing & Chemical washing upon completion

  3. To supply and lay protection at existing new floor area

FOC Items

  1. Mayer Hood ( MMS1900HS Sum Hood )

  2. Mayer Cooker MMSH772H or MMGH773H

  3. Kitchen Sink E600 Single Bowl Top Mount Sink (600 x 500 x 240mm )

    or E880 Double bowl top mount sink ( 880 x 480 x180mm )

  4. Kitchen sink tap E+NT 4915

  5. a) Mitsubishi Electric Sys 3-1 MXY3A28VA, MSYGE10VA x 3 ( Top-up cost $1,888 only )

b) Mitsubishi Electric Sys 2-1 ( Top up cost $1,288 only )

*Price above not inclusive GST

Our HDB BTO Renovation Projects

Factors for BTO HDB renovation costs

There are many factors affecting the costs of renovation. The key factors to look out for would be the following. Firstly, the size and type of your property, such as condo and landed property. Secondly, the type and extent of the amount of work required. Thirdly, who you would be hiring for the renovation. Fourthly, your property’s status on being brand new or resale. Next, the materials you would like to use. Lastly, the size of your property.

How do you choose the best HDB BTO renovation package?

It is not that you would know the exact things you should be getting at all times when it comes to renovating your home. Some clients might find be confused about exactly which interior design packages to select. For instance, which 2-room, 4-room, or 5-room HDB renovation package to choose. It will be of good use if you know how to choose at the beginning before consulting us. Fret not; we will be here to provide any form of help and guidance. But, if you would like to have a head start, you may check out the different renovation packages on our page.

Tips for anyone planning HDB BTO renovations

1.     Seek financial advice to prevent renovation fails

 Setting a strict budget for the whole renovation process is essential, apart from choosing which renovation package is best suited for you. One of the critical reasons for failures would be unexpected expenses. In the event the budget is exceeded, it can cause harm to the entire BTO package. In worse-case scenarios, the whole project falls apart. This can be avoided very easily by seeking financial advice from professionals.

2.     Plan ahead

It is simple logic that the more time you have, the less chaotic it will be for you.

You can prevent your targeted completion date from exceeding by having a well-thought-out plan. In other words, you may start planning right after you have a floor plan. Despite the company's reputation, you’re contracting for the job, and rushing your home renovations can still affect the quality.

Around how long do BTO renovation projects take?

Generally, it should take around 6 to 8 weeks. Do take note that every BTO renovation is unique and different. Hence, the timeline of the renovation project depends on how much work you would like to be completed.

Would renovations increase the value of your HDB?

It depends. Renovating your house will only increase the selling price only if potential buyers like them and would like to keep them. Hence, it depends on the preferences of your buyers.

Free Consultation For AC Vision Renovation Packages

AC Vision provides free consultation for HDB BTO standard and other interior design packages for homeowners seeking renovation in Singapore. We are more than happy to give free consultation. You can get them by contacting us and sharing your ideas and plans today.